Day 1 - Strip out
Time to strip and clean this beast!
We managed to get it stripped right back as far as we need to. So the pvc floor is out, bulkhead removed and the plastic wall covering behind the ply is all out.
Next step is inspecting for and addressing any surface rust, bare metal and sealing any areas water could possibly get in before giving the floor a good scrub in preparation for sound proofing and insulation.
Oh and of course, we've now had our first cuppa in the van!