Week 15 - Taps, Tanks, Shower

Tom

Starting to feel like a campervan now!
Tap, fresh water tank, drinking water filter, a drawer and a few drawer/cupboard fronts all done and painted (although the 12mm plywood sucks and keeps warping). Ellen’s painted loads of walls and the ceiling and a few cupboard doors and drawer fronts.

We also struggled through and got the shower walls in and the floor. Then fitted a back to the stove cabinet finally and we've gotten the back curtains in too.

Hopefully proper worktops and mattress/seat foam will finally arrive this week. But we do need an upholsterer now.

Top cupboard decisions might also be made next week and the grey waste tank will hopefully be built at the weekend if I get time.